仕事関係覚書きの最近のブログ記事

Park and Power     First day work for OB Van
Rig / De-rig         Set up / Pack up
Black Burst         A kind of reference signal
Tri-sync            A kind of reference signal
XLR
OB VAN
Integrated OB        A Truck which integrate PGM of different OB van
Switch board        Board with a lot of buttons in OB Van
Strike            Packing up

1.  Always be present at the beginning of a session.  Don't take any chances!
2.  Meet OVR in person
3.  If there is a graphics room, ask OB vans to provide a PGM for QC
4.  make a check list
5.  if possible test operator whether they can troubleshoot network.
6.  if in doubt of operators capability, be present.

 

Agile

| | コメント(0) | トラックバック(0)
Agile:
- N/W ports now integrated in Agile.  Primary and Backup fail over takes approx. 1 min.
- When integrated pull up a keytest for mixer to make adjustment.
- Keytest is to be called up on top of OB's color bars.  both color bars must align vertically.
- Keytest is also used to match grey scale on the bottom left hand side.  mixer usually needs to set it to additive mode, gain 100%, clip 0%(or 50%) and opacity 100%.
- Do above for OTD channel ( channel 2 ) also.
- OTD audio is AES digital.   Output is from channel 2 XLR.
- How to become superuser:  Utilities - Display preference (CONTRAST)
- How to compile:
1. become super user
2. F10
3. Files -> Templates -> compile
- How to load new OTD:
1. become super user
2. Utilities -> Transition Manager
3. Delete current images
4. Load Audio file
5. Load new Rings file
- How to Load a keytest in channel 2
1. become super user
2. Utilities -> Transition Manager
3. Do a find on keytest.tga
4. Select Transition 2
5. Load that image
6. Double click to send the keytest to PGM

カテゴリ

2008年8月

          1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31            

最近のブログ記事

Photos